
Summer 2018 has been a busy one for carrying in-situ remediation works at our remediation sites. Barking Wharf has undergone large-scale Petrocleanze injection and pumping of a free-phase hydrocarbon impacted area as well as injecting a 150m long 3dME Permeable Reactive Barrier with long-term ‘top-up’ capability.
Down the road in Bromley-by-Bow, we have also used Petrocleanze injection and pumping of a hydrocarbon impacted smear zone to avoid significant deep excavation.
Two other Soilfix sites have used oxygen release granules at the base of remedial excavations to promote enhanced residual treatment.
Comments are closed.