Go to top
Call: 01179 820025
Call: 01179 820025
Former Oxted Gasholder Station
Archive
Category: Remediation
20 May
2019

Former Oxted Gasholder Station

Soilfix are pleased to have commenced our first Remediation & Enabling contract for St William Homes LLP under the Berkeley Group call-off contract at the former Oxted Gasholder Station.  Having recently demolished the above ground gasholder, St William has planning permission to redevelop the site with 111 apartments with an enhanced access route from Station..

02 Apr
2019

Greater London Asylum at Cane Hill, Coulsdon

Works carried out at the former Greater London Asylum at Cane Hill, Coulsdon by Soilfix during 2015/16 is now nearing completion of a stunning residential housing development by Barratt David Wilson Its always satisfying to see all of our previous hard work create places that people aspire to work or live in, whilst safeguarding our..

07 Mar
2019

Plumestop Injection

In-situ treatment of a mixed hydrocarbon and organochlorine pesticide plume within a shallow aquifer is continuing at our remediation site in Ipswich. This week, Soilfix have undertaken hydraulic conductivity profiling (HCP) testing of soils to provide further detailed information on the permeability of soils throughout the treatment horizons. The information is being utilised to aid..

07 Nov
2018

Ipswich Remediation Underway

Soilfix have commenced a soil & groundwater remediation project in Ipswich for a large Blue-Chip client.  Works are well underway and progressing well, with tank decommissioning and soil excavation / reinstatement works ongoing.   Comprehensive in-situ groundwater treatment will comprise chemical oxidation, groundwater/NAPL recovery followed by injection of PlumestopTM liquid activated carbon to rapidly reduce..

16 Jul
2018

Dusty Business….

Preventing dust emissions has been one of the key operational priorities on many of Soilfix’s remediation sites during recent dry weather.......