In-situ Bio-chemical Oxidation—Chalk Aquifer

Shoreham, East Sussex

Soilfix were appointed to provide a ’fast track’ betterment of an identified groundwater hydrocarbon smear zone in a Principal Aquifer, to facilitate ongoing development of affordable residential apartments.

 

Client: Real Places Ltd
Date: 2022
Type: In-situ Groundwater Remediation
Value: £69K

THE CHALLENGE:

A diesel saturated smear zone (with C12 to C21 Aliphatic / Aromatic TPH) associated with a former underground diesel AST was identified at a depth of 4-6mbgl within weathered (structureless) chalk. Ex-situ remediation was not commercially viable due to tight logistical constraints requiring sheet piling and off-site disposal of all excavated soils.  Moreover, given the site was under active construction, there would be limited opportunity for staged in-situ treatment.

OUR SOLUTION:

A ‘one-stop’ treatment solution, KLOZUR-CRTM was selected for in-situ treatment of the diesel saturated smear zone and to reduce dissolved phase TPH – this process combines In-situ chemical oxidation (ISCO) for rapid mass reduction and desorption of TPH from the smear zone, with a controlled Oxygen Release activator component for enhanced aerobic bio-degradation of desorbed / dissolved hydrocarbons over a 9 to 12 month period post-injection.  Following a successful pilot feasibility trial, Soilfix ensured effective distribution of the remediation amendment within the target treatment zone via the following approaches:

  • Coring and vacuum excavation of the upper 1.2m of made ground for service and shallow impediment clearance, infilled with a cement-bentonite plug prior to injection;
  • Direct-push injection of Klozur-CR using a drill equipped with a percussive hammer to drive injection rods into the ground;
  • The injection tip was equipped with a 600mm screen to achieve an even distribution of the liquid amendment at each injection interval;
  • 25nr direct-push point injections were undertaken across the 275m2 delineated source area (in 0.5m increments across the target treatment zone of 4-6 mbgl);
  • Oxygen levels and pH readings of the target aquifer was monitored in nearby available wells during injection treatments to ensure the smear zone was fully influenced; and,
  • Post-injection monitoring of field parameters and laboratory testing of TPH in groundwater was carried out for a period of 12 months.

Post-injection monitoring confirmed dissolved TPH concentrations were reduced in all verification wells below the 75% betterment criteria agreed with the EA, enabling our client to meet their planning condition obligations pertaining to contamination below the site.

Talk to our team

Peter Howland
Managing Director

Our projects