Soilfix successfully remediated our site on time and budget despite an increasing scope of works caused by unforeseen underground tanks and associated contamination


Services
Completed as an integral part of a remediation contract where programme/cost savings can be achieved through efficient phasing, recycling of materials and managing pollution risks.




Former industrial activities can leave behind a legacy of toxic waste including chemical & fuel residues. In an ideal world this would have been cleared by previous occupants. Where not, they can prove a pricey addition to demolition works and, where handled inaccurately, can worsen contamination problems.
At your brownfield site in Newport, Soilfix can manage the clearance of waste and chemicals to meet legal requirements and lower environmental risks.




Soilfix personnel are skilled in above and below ground demolition works in Newport. By utilising a mixture of these services you have the opportunity to reduce project costs and maximise the re-use of demolition materials reducing environmental damage.
Previous Newport demolition projects have included service stations, transport depots and waste water treatment works. Soilfix undertakes thorough risk assessments and strives to gain a comprehensive understanding of client requirements and site constraints prior to commencing any demolition work. Where required, Soilfix can also manage the safe removal of hazardous building materials including lead-based paints and asbestos.




Fuel/chemical tanks and infrastructure need to be removed in a controlled manner by a qualified contractor to minimise risks of further contamination. Soilfix ensures that residual liquids are removed to the greatest extent possible and takes steps to render vessels inert before their removal. Impacted soils can often be removed and treated together.
Under certain scenarios and where risks are acceptable, redundant tanks can be left in situ. Cleaning, degassing and filling vessels with inert material (e.g. concrete slurry, foam or sand) dwindles ongoing risks and can be a more cost effective alternative to removal.




Soilfix is devoted to providing its clients with the most sustainable use of materials generated on the site. Measures often include: Crushing of concrete, brick and tarmac to form engineered fill; Reuse of sub-grade granular materials; Improvement of the geotechnical properties of existing materials; Manufacture of subsoil and topsoil from effected strata; Composting of green waste; and off-site recycling of metalwork. These operations decrease traffic movements and reduce build costs.