Completed as a crucial part of a remediation contract where programme/cost savings can be achieved through effective phasing, recycling of materials and managing pollution risks.




Toxic waste from previous industrial activities can be left behind, including chemical & fuel residues. In an ideal world this would have been cleared by previous occupants. Where not, they can prove a pricey addition to demolition works and, where handled inaccurately, can worsen contamination problems.
Soilfix can manage waste/chemical clearance at your brownfield site in Preston to ensure compliance with legislative requirements and reduce risks to the environment.




Soilfix personnel are competent in above and below ground demolition works in Preston. By utilising a mixture of these services you have the opportunity to reduce project costs and maximise the re-use of demolition materials reducing environmental damage.
Previous Preston demolition projects have included Waste water treatments works, transport depots and service stations. Soilfix undertakes thorough risk assessments and strives to gain a comprehensive understanding of client requirements and site constraints prior to commencing any demolition work. Where needed, Soilfix can also manage the safe removal of hazardous building materials including lead-based paints and asbestos.




Fuel/chemical tanks and infrastructure need to be removed in a controlled manner by a registered contractor to minimise risks of further contagion. Soilfix takes measures to effectively remove residual liquids and renders vessels inert before their removal. Impacted soils can often be treated and removed together.
Under certain scenarios and where risks are acceptable, redundant tanks can be left in situ. Cleaning, degassing and filling vessels with inert material (e.g. concrete slurry, foam or sand) reduces ongoing risks and can be a low-cost alternative to removal.




Soilfix is devoted to providing its clients with the most sustainable use of materials generated on the site. Measures frequently include: Crushing of concrete, brick and tarmac to form engineered fill; Reuse of sub-grade granular materials; Improvement of the geotechnical properties of existing materials; Manufacture of subsoil and topsoil from effected strata; Composting of green waste; and off-site recycling of metalwork. By taking these measures traffic movements are reduced and costs are reduced.