Completed as an integral part of a remediation contract where programme/cost savings can be obtained through effective phasing, recycling of materials and managing pollution risks.




Former industrial activities can leave behind a legacy of toxic waste including chemical & fuel residues. Ideally, these will be removed by previous occupants. Where not, they can prove a pricey addition to demolition works and, where handled improperly, can aggravate contamination problems.
Soilfix can manage waste/chemical clearance at your brownfield site in Wolverhampton to ensure compliance with legislative requirements and reduce risks to the environment.




Soilfix personnel are competent in above and below ground demolition works in Wolverhampton. Combining these works with remediation can reduce costs, maximise beneficial re-use of demolition materials and reduce the risk of environmental impacts.
Previous Wolverhampton demolition projects have included Waste water treatments works, transport depots and service stations. Prior to commencement of any demolition, Soilfix carries out all necessary risk assessments and ensures a good understanding of client requirements and site constraints. Where required, Soilfix can also manage the safe removal of hazardous building materials such as asbestos and lead-based paints.




Fuel/chemical tanks and infrastructure need to be removed in a controlled manner by a qualified contractor to minimise risks of further contagion. Soilfix ensure residual liquids are removed as far as practicable and vessels rendered inert prior to removal. Impacted soils can often be treated and removed together.
Under certain scenarios and where risks are acceptable, redundant tanks can be left in situ. Cleaning, degassing and filling vessels with inert material (e.g. concrete slurry, foam or sand) reduces ongoing risks and can be a more cost effective alternative to removal.




Soilfix is dedicated to providing its clients with the most sustainable use of materials generated on the site. Measures often include: Crushing of concrete, brick and tarmac to form engineered fill; Reuse of sub-grade granular materials; Improvement of the geotechnical properties of existing materials; Manufacture of subsoil and topsoil from contaminated strata; Composting of green waste; and off-site recycling of metalwork. These operations decrease traffic movements and reduce build costs.