Former City Council Depot, Bristol

Bristol

Soilfix Limited were appointed by Vistry to carry out site clearance, remediation and enabling works at a former Bristol Council depot site.

 

Client: Vistry Group
Date: 2024
Type: Clearance, remediation and enabling
Value: £1,500,000

THE CHALLENGE:

The site was previously used as a refuse tip, with extensive historical infilling and ground raising with demolition wastes. Buried structures were present including a network of tunnels (formerly used by the fire service for confined space training), and a fuel tank farm. A number of buildings were present on site, some of which included HSE-licensable asbestos containing materials (ACMs). The site had become overgrown with significant vegetation cover, including a number of invasive species (mainly Japanese Knotweed and Himalayan Balsam). The proposed residential scheme required the reprofiling of site levels as well as a series of development platforms, to enable the site with a ’suitable for use’ development platform.

OUR SOLUTION:

Soilfix implemented a multi-disciplinary scope, fully in accordance with a Materials Management Plan developed using CL:AIRE DoWCoP, including:

  • Ecological surveys, invasive weed management, and controlled vegetation/tree clearance;
  • Segregation and removal offsite (for recycling) of 200 tonnes of fly-tipped wastes;
  • Removal of ACMs from buildings including the use of enclosures and enhanced suppression, followed by controlled demolition of all structures;
  • Decommissioning and breakout of 12 former fuel tanks, including contaminated soils;
  • Breakout of the tunnel network followed by engineered filling and compaction;
  • Recording of archaeological finds to help document Bristol’s local history;
  • Breakout and processing of hardstanding & sub-structures to produce approx. 4,000m3 of recycled aggregates, for sustainable reuse on site and avoid the need to import;
  • Excavation, modular processing and re-engineering of approx. 20,000m3 made ground;
  • Installation of 8,000m2 of working platforms including temporary works design and testing to FPS requirements.

Soilfix handed over a fully enabled site to Vistry ready for piling and construction, including a comprehensive verification report for the future discharge of regulatory planning conditions.

 