Services

Site Enabling Earthworks Swindon

Combined with remediation to provide a ‘one-stop’ package as Prime Sub-Contractor or Principal Contractor. As well as extracting the barriers to redevelopment, this adds considerable value by loweing various project risks – in particular programme and commercial. Our site enabling works for construction in Swindon include retainment solutions, bank stabilisation, development platforms, geotechnical improvement, archaeological and ecological support.

Princes Risborough Housing Site
site enabling works

Combining Works

As part of our site enabling earthworks in Swindon, Soilfix can combine remediation works with civil engineering adding value and reducing the risks through:

  • Having a senior contractor responsible for health and safety on these elements;
  • Reducing project costs (e.g. increase in recycling);
  • Reducing programmes; and,
  • Preventing cross contamination.

As a competent contractor often filling the role of Principal Contractor, we employ well trained and experienced operatives and Sub-Contractors that can deliver cost-effective, high quality and innovative resolutions to individual projects, regardless of size.

Cut and Fill

Employing a contractor who possesses a comprehensive knowledge of contamination and waste regulations can yield significant benefits for brownfield cut & fill projects. By employing careful management and implementing effective remedial technologies, Soilfix can optimise the on-site reuse of materials to their fullest extent. This can result in a significant reduction in the cost of off-site disposal and soil import. The cut and fill exercise itself can also become an important component of a remediation strategy.

All Soilfix cut and fill services in Swindon are carried out fully in accordance with CL:AIRE Code of Practice, to ensure clients remain legally compliant when soils and recovered aggregates are re-used on-site.

Soil Stabilisation / Solidification Swindon

Alongside immobilising contaminants, stabilisation can be tailored to meet the construction requirements of a project. Soilfix has vast experience in soil stabilisation to form a piling mat, capping layer or engineered fill below the development platform. Get in touch today to speak more about our soil stabilisation services in Swindon.

Infrastructure in Contaminated Ground

Soilfix have the potential to complete contaminated ground infrastructure works in Swindon such as service trenches, large drainage runs, attenuation tanks, interceptors, etc. Where installed in contaminated strata, such works can have significant implications for the health & safety of site workers and elevated costs associated with management, environmental controls and waste disposal. Having all the core skills in-house, Soilfix is often able to reduce costs associated with such works, particularly when in conjunction with remediation. Soilfix can also assist other contractors on site to meet their environmental and health & safety obligations.

Jamie Mitchell Soilfix

Enquire about site enabling works in Swindon

Jamie Mitchell
Pre-Construction Manager

Our projects