Services

Site Enabling Earthworks Liverpool

In conjunction with remediation to provide a ‘one-stop’ package as Prime Sub-Contractor or Principal Contractor. As well as expelling the barriers to redevelopment, this adds considerable value by minimising various project risks – in particular programme and commercial. Our site enabling works for construction in Liverpool include development platforms, geotechnical improvement, retainment solutions, bank stabilisation, ecological and archaeological support.

Princes Risborough Housing Site
site enabling works

Combining Works

As part of our site enabling earthworks in Liverpool, Soilfix can combine civil engineering with remediation works adding value and lowering the risks through:

  • Having the same contractor responsible for health and safety on these elements;
  • Reducing project costs (e.g. increase in recycling);
  • Reducing programmes; and,
  • Preventing cross contamination.

As a competent contractor often filling the role of Principal Contractor, we employ highly skilled operatives and Sub-Contractors that can deliver innovative, high quality and cost effective solutions to individual projects, regardless of size.

Cut and Fill

Employing a contractor who possesses a comprehensive knowledge of contamination and waste regulations can yield significant benefits for brownfield cut & fill projects. With the correct management and remedial technologies, Soilfix optimise the re-use of materials on-site resulting in less waste or recycling cost. This can result in a significant reduction in the cost of off-site disposal and soil import. The cut and fill exercise itself can also become an important component of a remediation strategy.

All Soilfix cut and fill services in Liverpool are carried out fully in accordance with CL:AIRE Code of Practice, to ensure clients remain legally compliant when soils and recovered aggregates are re-used on-site.

Soil Stabilisation / Solidification Liverpool

As well as immobilising contaminants, stabilisation can be tailored to meet the construction requirements of a project. Soilfix has significant experience in soil stabilisation to form a piling mat, capping layer or engineered fill below the development platform. Get in touch today to speak more about our soil stabilisation services in Liverpool.

Infrastructure in Contaminated Ground

Soilfix have the ability in-house to complete contaminated ground infrastructure works in Liverpool such as attenuation tanks, interceptors, large drainage runs, service trenches, etc. Where installed in infected strata, such works can have great implications for the health & safety of site workers and elevated costs associated with management, environmental controls and waste disposal. Having all the necessary skills in-house, Soilfix is frequently able to minimise costs associated with such works, particularly when in conjunction with remediation. Soilfix can also assist other contractors on site to meet their environmental and health & safety obligations.

Jamie Mitchell Soilfix

Enquire about site enabling works in Liverpool

Jamie Mitchell
Pre-Construction Manager

Our projects