Combined with remediation to provide a ‘one-stop’ package as Prime Sub-Contractor or Principal Contractor. erasing the barriers to redevelopment, this adds considerable value by loweing various project risks – in particular programme and commercial. Our site enabling works for construction in Stoke on Trent include retainment solutions, bank stabilisation, development platforms, geotechnical improvement, archaeological and ecological support.

Princes Risborough Housing Site
site enabling works

Combining Works

As part of our site enabling earthworks in Stoke on Trent, Soilfix can combine remediation works with civil engineering adding value and lowering the risks through:

  • Having the same contractor responsible for health and safety on these elements;
  • Reducing project costs (e.g. increase in recycling);
  • Reducing programmes; and,
  • Preventing cross contamination.

As a competent contractor often filling the role of Principal Contractor, we employ well trained and experienced operatives and Sub-Contractors that can deliver innovative, high quality and cost effective resolutions to individual projects, large or small scale.

Cut and Fill

Employing a contractor who possesses a comprehensive knowledge of contamination and waste regulations can yield significant benefits for brownfield cut & fill projects. Soilfix can maximise the re-use of materials on site through careful management and application of remedial technologies. This can result in a significant reduction in the cost of off-site disposal and soil import. The cut and fill exercise itself can also become an important component of a remediation strategy.

All Soilfix cut and fill services in Stoke on Trent are carried out fully in accordance with CL:AIRE Code of Practice, to ensure clients remain legally compliant when soils and recovered aggregates are re-used on-site.

Soil Stabilisation / Solidification Stoke on Trent

As well as immobilising contaminants, stabilisation can be tailored to meet the construction objectives of a project. Soilfix has vast experience in soil stabilisation to form a piling mat, capping layer or engineered fill below the development platform. Get in touch today to speak more about our soil stabilisation services in Stoke on Trent.

Infrastructure in Contaminated Ground

Soilfix have the potential to complete contaminated ground infrastructure works in Stoke on Trent such as large drainage runs, service trenches, interceptors, attenuation tanks, etc. Where installed in infected strata, such works can have significant implications for the health & safety of site workers and elevated costs associated with management, environmental controls and waste disposal. Having all the necessary skills in-house, Soilfix is often able to reduce costs associated with such works, particularly when in conjunction with remediation. Soilfix can also assist other contractors on site to meet their health & safety and environmental obligations.

Jamie Mitchell Soilfix

Enquire about site enabling works in Stoke on Trent

Jamie Mitchell
Pre-Construction Manager

Our projects